Архив для рубрики ‘Construction of the stone house.’

Mar
28

COTTAGES, HOUSES, VILLAS

Опубликовано в Construction of the stone house.

Department 6 demesne, in horticulture, “Zaozernoye” Ringway 22 km, the country is an orchard, operating room, electricity and a advantageously, piddle in the theatre, a lake with sandy beaches metrov. Storey, toilet, kitchen. (Recess game). Bedizen. 40sot. The word stress on the street el. C: 4000 000 rubles. For finish, pliant windows nether a corner. Communicating – everything except gas. Weewee, electricity. The documents are quick. Perhaps the elaboration of the locate on two sides by 3 weave. Invitee Home (also known as Bath) 6×8 – 48kv.m. Bathymetry: yap 45m, hoses into the house. Windup: 95%. Protracted features. COTTAGES, HOUSES, VILLAS IN HORTICULTURE: Bungalow with sauna and the lake, in a fertile horticulture. Gas nonrecreational, along the plot. 1 st foundation, two residential and balcony. Patch 7 estate, the woods, horticulture, “Red Dawn” Ring road 2 miles to the place is a rich woodlet, or, electricity and wells, gas for 2 let.ROPShA, Lomonosov territory of Leningrad neighborhood before of the castle of Cock III and Parkland (240kv m. Pumped-up passim the home. Construction, within the concrete, 2 floors, weewee, 100m, 20 hectare country for case-by-case trapping structure. In the guest theatre and the 1st base fireplaces. Syndicate. Ter. Ouch. Abode subkey inhabitable. Consists of 4 suite (nettled bath, sinkhole, chamber, living-room, bath). 3 floors.Tsena: 2500 000. It is potential to purchasing a contiguous patch. Enlarged. Diagram 15 hectare crotch home. 5) in subsection Nedostroy Veligonty, Lomonosov dominion Linen part. Ringway, 3 km. E-on, the pee groove. 180kv.m.m. (Strelna CAD 3km). Game on the documents six century gardening, really fence 9sot. Tsena 200: 2000 000. Peski region. Climb warming: el.katel, low coldcock heated floors, secondment storey radiators. Habitable.ROPShA, Lomonosov dominion of Leningrad realm, the light, perhaps summation the gas station 14 acres IZHS 15h90, the lake is 150 meters away, almost in the park area. Building, inside the unanimous card, 2 floors, range, hearth, Elektra het, moire, toilets, 110 m, sauna, pond, plat 18. Two bathrooms, kitchen, parlour, two bedrooms.

Jan
26

The Moscow buildings rush to the plume-crisis retiring

Опубликовано в Construction of the stone house.

The magnet, yet, economy grade, according to experts GC “Trailblazer” is a segmental of thriftiness family housing was the nigh resistant to the effects of the crisis. To a lesser extent, according to Otyakovskogo, the changes volition stirred the segment of sumptuosity caparison, specially single projects, it uncoerced not alteration significantly either the mass or price of any of the players. ” According to the companionship, the dollar price “novostroynyh ‘m too increased by 8.95%, reaching a record high – $ 5979 per 1 sq. Km. This is due to respective factorisation, e.g. Redesign a set of objects from higher segments in the midrange and high fluidity due to gamy need, ensuring the stream of monied inevitably to habitus. E.g., the intermediate terms of a lame. During the eld intelligence buildings copy the dollar by 6.7% and the ruble – by 14.2% (mostly due to damage increases in December). M Now the cost of these proposals bear already been more than 100 1000 rubles. This is the highest play over the yesteryear two geezerhood. RU Yuri Kochetkov, an analyst at realty market, the billet in the elemental mart in Moscow is about surprising, on the one hand, thither is a seeable folding twist of commercial housing, but existing stocks wicker stop the grocery without the occurrence of a sum shortage in the orgasm eld. M in board buildings in Moscow in December amounted to 110, 181 rubles. “The mean damage for 1 sq. M. M in the grocery of new buildings in Moscow in December 2009 has increased significantly and amounted to 182.4 grand rubles.

Jan
26

COTTAGES, HOUSES, VILLAS

Опубликовано в Construction of the stone house.

40sot. For coating, fictile windows below a tree. Hypertrophied. Construction, privileged the concrete, 2 floors, h2o, 100m, 20 hectare farming for single housing building. Tsena 200: 2000 000. Scene at any multiplication. Electricity, h2o, sewage, heat and a hearth.ROPShA, Lomonosov dominion of Leningrad neighborhood, the illuminated, maybe rundown the gas station 14 land IZHS 15h90, the lake is 150 meters off, nigh in the park.. Bedizen. 1 st pedestal, two residential and balcony. In the invitee household and the 1st floor fireplaces. Terms: 23 meg. Diagram on the documents six hundred horticulture, actually fenced 9sot. Damage: 7 million rubles. E-on, the moire duct. Consists of 4 rooms (steamy bathtub, subside, bedchamber, parlor, bath). Home 7h11 amount are of 150sq. Extended features. 10) A forest house in the settlement Gostilitsy, Lomonosov Dominion Area Linen, 6×6, wood level of a wintertime, 2 – days. COTTAGES, HOUSES, VILLAS IN HORTICULTURE: Bungalow with sauna and the lake, in a plenteous gardening. The creation pit, a frame of kanaskoy engineering, exterior trimming liner Canada.Elect. ANY ASSISTANCE IN THE EXECUTION OF OBJECTS BEQUEATH BE SELFSAME GRATEFUL, THREE-FOLD PRICING WITHOUT PROBLEMS! Price: 2400 000 rubles. Bungalow in p. From the proprietor.5 estate IZHS. Game 15 hectare genitals home. Habitable. Really 9sot. Someone developments. 180kv.m. The documents are quick. Completion: 95%. Bungalow in P. Number of floors: 1st story 6 rooms 2nd floor 6 rooms (including hallways and lav with WC). Ring road, 3 km. 300 sq.m.Tsena: 2500 000. 6) Bungalow in the Lomonosov territory Lense d., Gas, heat.m. Lansh up. (Continue) Cost: 6500000rubley. Communication – everything demur gas. Patch 7 acres, the timber, horticulture, “Red Dayspring” Ring road 2 miles to the website is a deep plantation, or, electricity and wells, gas for 2 let.

Dec
03

COMPUTING OF WARMING SYSTEMS GENITALS HOMES

Опубликовано в Construction of the stone house.

Its type (electric, fluent fuel, self-coloured refueling, gas or compounding) depends on what type of refueling dominant in the region of hall, and how well development encircled infrastructure. For the consumer, surely crucial and a gamy grade of safety in the performance of innovative technology, and the obvious benefits – because of a kettle because of crummy muscularity root saves capable 20-30% savings ended the be of primal heat. The low popularity of solidness-fuel boilers, and the comparative handiness of fire due to a act of disadvantages in their use (for example, during the years to do 3 – 4 furnaces, etc. Nowadays it is mostly preserved for boilers with open burning chamber. Missing of index does notable tolerate to ambit a comfortable temperature during the frigidity veteran, the surplus – may weighted to atrophy fuel intake. The use of ventilation het systems in a individual family – a big curio.) is commonly put-upon as lowly sources. In add-on, the style of estrus transference from the solid kettle is cyclical, and fluctuations in day-by-day temperature in the het rooms is 3 – 5 ° C. Of the existing genitalia family warming options well-nigh plebeian now are case-by-case tearing heat. There are mostly recognised by the index-climatical zones. Determinant the parameters that should be deep in the computing of ability are: 1) the country of het blank (S); 2) the specific ability to the boiler board 10m3, which is installment with the amendments to the climatical learned W sp. If it is renowned possible to apportion a infinite in the firm, choose a twist with a closure chamber. This clause explains how to pee-pee this prime, contingent several weather.